North East Pallet Racking Suppliers and Installers - JOG Consultants
  • Home
  • About Us
    • Racking Services >
      • Racking Consultation
      • Racking Safety Inspection
      • Racking Repairs
  • Pallet Racking Types
    • Pallet Racking
    • Drive In Racking
    • Narrow Aisle Racking
    • Mobile Racking
    • Cantilever Racking
    • Live Storage Racking
    • Dynamic Push Back Racking
    • Carton Flow Racking
    • Archive Racking
    • Heavy Duty Pallet Racking
    • Second Hand Racking
  • Pallet Racking Protection
    • Column guards
    • End of Rack Barriers
    • Pallet Support Bars
    • Mesh & Timber Supports
    • Racking Guard Netting
    • Anti-Collapse Mesh
    • Mesh Enclosures
    • Racking Guide Rail
  • Portfolio
    • Pallet Racking - Newcastle-Upon-Tyne
    • Pallet Racking - Merseyside
    • Narrow Aisle Racking - Merseyside
    • Narrow Aisle Racking - Durham
    • Narrow Aisle Racking - Middlesbrough
    • Drive In Racking - Gateshead
    • Mobile Racking - North E England
    • Archive Racking - Tyneside
    • Archive Racking - Newcastle
    • Live Storage Racking - North West England
    • Live Storage Racking - Durham
    • Racking Inspection - North East England
  • Contact Us

Archive Racking Project -
 Newcastle Upon Tyne


With a growing reputation for bespoke archive solutions JOG Consultants was approached by a Newcastle based and North East operating firm who required our guidance to design a 28,000 box archive storage centre for important documentation.

Using the latest AutoCAD design programs we designed a bespoke racking system using every feasible space in the 675 sq metre warehouse. After providing a number of proposals it was decided the most suitable system was a two tier racking system with a timber mezzanine floor, using the full height of the 9m warehouse and allowing for bespoke ladders to enable 100% acessiblity.
archive racking newcastle plan
AutoCAD designed plans
emplty archive racking warehouse
Starting with a blank canvas

We were awarded the project based on a full and comprehensive proposal and previous project experience with our client.  

Precision archive racking design
Milimeter precision
Picture
A work in progress
Picture
Fitting the timber deck
We used our own experienced pallet racking installers to install this bespoke system on a tight ten week schedule. The major construction issue was due to a lack of storage space for materials as we built the system, but using a prearranged schedule and using experience evolving over 30 years, we were able to overcome this issue. 

As project managers for this archive project we were also asked to arrange for the installation of all electrics including standard and emergency lighting, smoke detection and the alarm systems, once these were fitted we were able to complete the installation by installing the staircases and mesh protection to all exposed areas. In all the project was finished on time and to budget. The 'JOG Consultants  Standard'.
Picture
Finished archive storage
Picture
Finished Archive Racking
Client Review - " A fine installation making the best use of space available. All went to plan and the project was completed within our time scale. I would highly recommend JOG Consultants".

JOG Consultants provide an extensive range of North East Storage Solutions: 
Mezzanine Floors |  Office Fit-Out Services | Industrial Solutions
Powered by Create your own unique website with customizable templates.